GIANNI INDUSTRIES GK140 Electric Strikes Instruction Manual
GIANNI INDUSTRIES GK140 Kumenya Magetsi

zofunika

  • Opaleshoni Voltage: 12 kapena 24 VDC
  • Voltage Tolerance: ± 10%
  • Zojambula Zamakono: 700mA/12VDC ; 350mA/24VDC
  • Kutentha Kwambiri: 14°F to 120°F (-10°C~+49°C)
  • Chinyezi: 0 ~ 85% osavomereza
  • Solenoid Testing: Zozungulira zopitilira 250,000
  • Sakanizani: Mpaka ma lbs 200
  • Static Strength: 1,200 lbs (GK140 Series) 1,000 lbs (GK145 Series)
  • Ntchito yomanga: Chitsulo chosapanga dzimbiri
  • Kalemeredwe kake konse: 673g
  • Latch Throw: GK140: 15 mm, GK145: 11 mm (With 3mm door gap)
  • Keeper Width: 48mm
  • Lock Mode: Kulephera-chitetezo

paview

Chenjerani!
Please follow the sticker’s instruction to install the strike.

Keeper Adjustment (GK145 Only)

Keeper Adjustment

The strike keeper can be adjusted horizontally to account for various installation anomalies. To adjust the keeper, loosen the adjustment screws, move the keeper horizontally as needed, and retighten the adjustment screws. (Maximum adjustable range: 3mm)

paview

Handing Guide

Handing Guide

Door handing is determined from the side of the door where the hinges are visible, according to the German standard DIN 107. Stand facing the door on the hinge / pull side. If the hinge is on the right, the door is considered to be DIN right. If the hinge is on the left, then the door is considered to be DIN left.

Models (M: Door Status Monitor)

DIN left DIN right
GK140-L-12 GK145-L-12 GK140-R-12 GK145-R-12
GK140M-L-12 GK145M-L-12 GK140M-R-12 GK145M-R-12
GK140-L-24 GK145-L-24 GK140-R-24 GK145-R-24
GK140M-L-24 GK145M-L-24 GK140M-R-24 GK145M-R-24

Mabulaketi Osasankha

Mabulaketi owonjezera milomo amapezeka kuti apangitse ma jamb okulirapo.

Mabulaketi Osasankha

Mortise Mount in Wooden Frame

Chimango

Chithunzi cha Wiring

Chithunzi cha Wiring

Kukhazikitsa Mapulani

  1. Measure the vertical and horizontal position of the latch bolt on the door leaf.
    Kukhazikitsa Mapulani
  2. Mark the position of the latch bolt on the door frame as shown in the figure.
    Kukhazikitsa Mapulani
  3. Mount the supplied template and align to the marked line.
    Kukhazikitsa Mapulani
  4. Boolani ndi kudula chimango molingana ndi template.
    Kukhazikitsa Mapulani
  5. Tighten the indicated screws.
    Kukhazikitsa Mapulani
  6. Connect the wires and install the strike.
    Kukhazikitsa Mapulani

Dziwani ICON Zindikirani

It must be ensured that there is a small space between the latch bolt and actuated latch stop when the door is closed and the latch bolt is in its locked position. This will relive pressure on the solenoid valve and reduce the risk of failure when opening the door.

Zolemba / Zothandizira

GIANNI INDUSTRIES GK140 Kumenya Magetsi [pdf] Buku la Malangizo
GK140 Electric Strikes, GK140, Electric Strikes, Strikes

Kusiya ndemanga

Anu email sati lofalitsidwa. Amafuna minda amalembedwa *